System Improvement Rotterdam Metro

Part of the metro network in Rotterdam passes 21 level crossings. This metro is legally a high speed tram, but completely laid out on its own track.

Many of these intersections are equipped with level crossing barriers, but the speed of the subway at the intersection is limited to 50km/h. The installed level crossings are at the end of their lifespan. In 2017, RET started a project to increase the safety of the existing crossings and replace all crossings for new "standard" crossings, to adapt the priority of the metro at the intersection and to increase the speed over a part of the route.

The Attica consultants are involved in the preparation of specifications and contracts, project management, safety management, systems engineering and coordination with internal and external operational parties.

Client: RET
Role:

- Project Coordinator/Technical Project Manager
- Safety Manager
- System Engineering Advisor
- Advisor for operational coordination between RET, the police and the safety region.